Custom Welding System for Stainless Steel Sinks

A customer in the appliance industry needed a company with the ability to design and fabricate a welding system to produce their stainless steel sink. Banner Welder was contracted to perform all of the required work, developing a turnkey work station fully equipped to handle the customer’s application. Configuring a semi-automatic welding and grinding line, the delivered system was capable of a 38 second per sink production cycle time, constructing the unit from 301 stainless steel. The system is initiated with a manual operator load, and the material is subjected to a preprogrammed gas tungsten arc welding (GTAW) process. The welded sink is then planished with a grinding operation to produce a cosmetic finish.

The welding line was manufactured within a turnaround time of 32 weeks, fully tested and debugged to ensure the meeting of customer standards and specifications. For more details about this custom semi-automatic welding and grinding solution, or the full menu of value added services and proven products please see the table below or contact us directly.

(Click on thumbnail to enlarge)

RequestQuote

Welding System Case Study Highlights

Case Study Name
Stainless Steel Sink
Case Study Description
This stainless steel sink is used within stainless steel bowls.
Capabilities Applied/Processes
Primary:
Gas Tungsten Arc Welding (GTAW)
Secondary:
Planishing & Grinding
Equipment Used to Manufacture Part
Semi-automatic Welding and Grinding Line
Manual Load (2) Bowls Auto
Material Used
301 Stainless
Material Finish
Cosmetic
In Process Testing/Inspection Performed
Yes
Industry for Use
Appliance
Volume
38 seconds per sink